County of Paintearth Crowfoot Industrial Forcemain


Construction of 4.1km of 150mm Sanitary forcemain, installed via horizontal directional drilling. The project included management and crossing of an existing waterbody outside of the Town of Castor, and the installation of valves, ARV’s, and tie into the Lift Station.

Year of completion

2024


Consultant

MPE Engineering