Past project
Town of Slave Lake – Low Pressure Sanitary System
Construction and installation of a low pressure sanitary distribution system in an industrial area in the Town of Slave Lake. This project had extremely difficult soil conditions and a high water table. HDPE line were installed via HDD.
Year of completion
2024
Consultant