Past project

Town of Slave Lake – Low Pressure Sanitary System


Construction and installation of a low pressure sanitary distribution system in an industrial area in the Town of Slave Lake. This project had extremely difficult soil conditions and a high water table. HDPE line were installed via HDD.

Year of completion

2024


Consultant

Associated Engineering

Previous
Previous

Town of Bellevue Watermain Upgrades

Next
Next

Town of Grande Cache 102nd Ave Utility Extension