Horizontal Directional Drilling
United Utilities Ltd. has Horizontal Directional Drilling crews capable of performing HDPE installations on pipe ranging from 50mm to 600mm in diameter. These crews not only add to the unparalleled experience of the underground crews, but further provide us the opportunity to offer our Clients added value by limiting the disturbance to established roads and surface structures. The HDD crews can also perform main installations during the winter months and periods of inclement weather, as it greatly reduces the risk and costs associated with open cut earthworks in freezing conditions. If trenchless installation is an option on your next project, we have the tools and equipment required to get the job done.